Amazon cover image
Image from Amazon.com

How to meet requirements for hazardous waste landfill design, construction, and closure / U.S. Environmental Protection Agency

Contributor(s): Material type: TextTextLanguage: Eng Publication details: Park Ridge, N.J., U.S.A. : Noyes Data Corp., c1990Description: xii, 123 pages : illustrations ; 26 cmContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • 0815512422 :
Subject(s):
Contents:
Overview of Minimum Technology Guidance and Regulations for Hazardous Waste Landfills Liner Design: Clay Liners Flexible Membrane Liners Elements of Liquid Management at Waste Containment Sites Securing a Completed Landfill Construction, Quality Assurance, and Control: Construction of Clay Liners Construction of Flexible Membrane Liners Liner Compatibility with Wastes Long-Term Considerations: Problems Areas and Unknowns Leak Response Action Plans
Summary: Presents a summary of EPA regulations and guidances on the design of double liners and leachate collection and removal systems, leak detection systems, final cover, and construction quality assurance for hazardous waste landfills.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Shelving location Call number Copy number Status Barcode
Books Books Harare Institute of Technology Main Library Harare Institute of Technology Main Library General Collection TD1040 HOW (Browse shelf(Opens below)) 1 Available BK002854

Spine title: How to meet requirements for hazardous waste landfill

Includes bibliographical references

Overview of Minimum Technology Guidance and Regulations for Hazardous Waste Landfills Liner Design: Clay Liners Flexible Membrane Liners Elements of Liquid Management at Waste Containment Sites Securing a Completed Landfill Construction, Quality Assurance, and Control: Construction of Clay Liners Construction of Flexible Membrane Liners Liner Compatibility with Wastes Long-Term Considerations: Problems Areas and Unknowns Leak Response Action Plans

Presents a summary of EPA regulations and guidances on the design of double liners and leachate collection and removal systems, leak detection systems, final cover, and construction quality assurance for hazardous waste landfills.

There are no comments on this title.

to post a comment.